Kohler K-19796 Guia De Instalacion página 3

Ocultar thumbs Ver también para K-19796:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Before You Begin (cont.)
Shut off the main water supply.
The supply location is not standard. Install the supply following
the rough-in diagram.
Observe all local plumbing and building codes.
Kohler Co. reserves the right to make revisions in the design of
products without notice, as specified in the Price Book.
Kohler Co.
3
1052867-2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido