Biral BIM B2 Instrucciones De Instalación página 17

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
17
a) Switch off any external
voltage at clamps
51, 52, 54 separately
b) Open the lid
c) Check the voltage
at the pump
d) Install and connect
the control module.
Steps ➀ to ➄
e) Connect the desired
function and configure
according to points
2 to 5 as necessary
f) Close the lid
g) Switch the pump
back on
Note:
Use shielded cable
with a maximum 1 mm
cable cross-section.
– Area (A)
10 mm stripped cable
– Area (B)
with shrink tubing
All cable used must be
heat-resistant up to
+85 °C.
All cables must be
connected in accordance
with EN 60204-1
and EN 50174-2: 2000.
english
Warning
1. Installation of the control module
2
Before connecting the control module,
the supply voltage must be switched off
at all poles.
The electrical connection
must be made by a specialist.
The electrical connection
must be carried out in accordance
with the local regulations.
A
B
10
961596_00
10

Publicidad

Tabla de contenido
loading

Tabla de contenido