Pre-Assembly; Planning Installation; Tools Required; Hardware Included - Home Decorators Collection GPBGVT3118DR Guía De Uso Y Cuidado

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pre-Assembly

PLANNING INSTALLATION

The metal secure mount bracket (A) must be screwed into at least TWO 2 x 4 wall studs and secured within 4" of each end of the bracket.
In the event 2 x 4 studs cannot be located within this area, additional bracing must be installed behind the nished wall as follows.
Position the board between two studs so that the front surface of the bracket is ush with the front of the studs. The nished wall is then
applied over the board.

TOOLS REQUIRED

Carpenter
level

HARDWARE INCLUDED

NOTE: Hardware not shown to actual size.
AA
Part
Description
AA
Mounting bracket
BB
Screw

PACKAGE CONTENTS

Phillips
Screwdriver
BB
Quantity
Part
Description
A
Vanity
B
Top
Silicone
sealant
1
7
A
3
B
Quantity
1
1
HOMEDEPOT.COM/HomeDecorators
Please contact 1-800-986-3460 for further assistance.
Clean
rag

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido