C O N T R O L B O X M O U N T I N G
1. Determine the spacing required for mounting and select the
proper holes to be used for mounting (Figure 1).
2. Knockout plastic from holes using screw driver.
Insert the strain reliefs (Figure 3).
3. Place box up against the mounting surface. Insert the screws
through the mounting holes in back and secure in place
(Figure 2).
S T R A I N R E L I E F
Figure 3
Figure 1
Figure 1
(1) Screw Spacing 101.6mm (4")
(2) Screw Spacing 152.4mm (6")
(3) Screw Spacing 63.5mm (2-1/2")
Figure 2
Figure 2
Mounting Post
(1) Mounting Post
Figure 3
(2) E-Box
(3) Mounting Screws (4 pieces)
1/4" Washer (4)
Mounting Post
1/4" Washer (4)
1/4"-20
Hex Nut (4)
1/4"-20
Hex Nut (4)
5
1
1
2
3
2
3
1
1
3
3
Figure 3
1/4" Washer (4)
2
2
U-Bolt (2)
U-Bolt (2)
1/4" Washer (4)