EN
Operation
Injuries or material damage.
¾ Note the mains voltage.
¾ The voltage of the current
source must match
the information on the
identification plate of the
device.
Note
The power pack becomes hot
during operation.
Charging A
Plug the charger into a suitable
Î
socket A1.
3 The LED goes red.
Plug the power pack into the
Î
charger A2.
3 Charging starts and the LED goes
green.
Note
2 AH battery
The power pack is 80% charged
after about 50 minutes and fully
charged after about 70 minutes.
4 AH battery
The power pack is 80% charged
after about 100 minutes and fully
charged after about 140 minutes.
Risk of injuries or material damage.
¾ Pull out the mains plug.
¾ Do not open the device.
¾ In case of doubt always consult a specialist workshop.
12
CAUTION!
Troubleshooting information
LED charge state indicator on the
charger
LED status
Steady red
Flashes green
Steady green
Flashes red-green
Flashes red
Steady red
Note
To protect the power pack and
ensure a long service life, the
charger switches off as soon as
the power pack is fully charged.
¾ Do not store the power pack in the
charger, but separately from it.
WARNING!
Operation
Meaning
Mains voltage con-
nected.
Charging.
Charging completed.
Power pack possibly
defective. Arrange for
testing of the power
pack by a specialist
workshop.
Power pack too hot or
too cold. Charging starts
automatically if the
operating temperature is
correct.
Power pack is not
charging. Power pack is
not correctly inserted or
the contacts are dirty.
Note