Descargar Imprimir esta página

Battery Watering Technologies VMS1000 Instalación Del Sistema página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

This Package Contains:
1 - VMS1000
1 - Grommet
2 - Threaded Brass Insert with Screw and Lock Washer
2 - Self Tapping Screws
3 - Cable Ties
1 - Packet Dielectric Grease/Corrosion Preventer
• Always wear personal protective equipment (goggles, gloves, etc.)
• Be sure the battery is disconnected from the charger to ensure the cells
• Not recommended for use with battery additives.
• Read instructions in entirety before beginning the installation.
STEP 1: PLAN
The electrolyte probe must be at least 4 cells to the positive side of the negative (black) wire
connection. Take this into consideration when planning your installation. The sensor needs 8
volts to function properly.
STEP 2: DRILL
Choose a cell where the level probe will be inserted. (Reminder: you must have at least 4 cells
to the positive from the black (negative) wire.) Drill a 1/2" hole in the cell cover where the probe
will be installed. The hole should be drilled between the vent opening and the edge of the cell
to avoid cell internals. Do not drill into the battery plates.
1
Intended for Installation by Qualified Personnel
are not gassing before proceeding.
BLACK
Example of 18 Cell Installation
Example of Drill Zone
Installing the Visual Monitoring System
Part # VMS1000
Tools required for installation:
• Drill
• Insulated soft face hammer
• Phillips screwdriver bit
• 7/32" drill bit for inserts
• 1/2" (12 mm) drill bit for probe
• Insulated wire cutters
PROBE
RED

Publicidad

loading