STEP 2
Mark screw locations to the
center of the thick portion of
the door at least 12-1/2" from
the bottom, pre-drill pilot
holes, and attach wood frame
to the door with the provided
screws (See Figure B).
STEP 3
Insert waste container into the
mounted wooden frame (See
Figure C).
2
INSTALLATION INSTRUCTIONS: 4SOWC8 VANITY DOOR MOUNT WASTE CONTAINER INSTRUCTIONS
FIG. B
At least 12-1/2"
FIG. C
Mark screw
locations