Top left hand slide
(3) #8 x 5/8" screw hole locations
TOOLS REQUIRED:
ESTIMATED ASSEMBLY TIME:
20 MIN
A
CARE AND MAINTENANCE:
B
Clean with a damp cloth and
wipe parts dry.
PARTS LIST
C
A. (6) #8 x 5/8" Flat head screws
for 1/8" spacer
D
B. (6) #8 x 1" Flat head screws
for 1/4" spacer
E
C. (6) M5 Euro screws
D. (4) #6 x 1/2" Door mounting
screws
E. (6) 1/8" slide side spacer
F
F. (6) 1/4" slide side spacer
BASE ORGANIZER
Fig. 1
Fig. 3
Bottom right hand slide
21-5/8"
(549.5 mm)
Fig. 2
1/8" spacer for 7-3/4" & 10-3/4" openings.
No spacers needed to 7-1/2" and 10-1/2" openings.
(1/4" spacers are for custom cabinet openings)
Slide unit into cabinet and
attach door.
(3) #8 x 5/8" screw hole locations
12400 Earl Jones Way
Louisville, KY 40299
rev-a-shelf.com
Customer Service: 800-626-1126
STEP 1
Place template and mark hole
locations for the top left hand slide
(See Figure 1). Flip the template
and do the same for the bottom
right hand slide.
STEP 2
Attach slides to side and bottom
of cabinet using (6) #8 x 5/8" flat
head screws (See Figure 2).
STEP 3
Attach unit to slides
(See Figure 3).
STEP 4
Slide the unit into the cabinet and
attach door using (4) #6 x 1/2" flat
head screws (See Figure 4).
Note: Align adjustable mounting
brackets to the thickest portion of
the door.
Fig. 4
T-449FL-0219