9) Gather the wire harness from the transfer switch and pass the wires through the wall cavity and
into the load center. Then snap the fitting into the 1" KO in the load center. See photo at right.
10) Using the 1-1/4" screws provided, fasten the flush mount plate to the two studs described
earlier. Be sure to allow room for the cover of the load center to be re-mounted when fastening the
flush mount plate to the studs.
11) Follow the wiring instructions provided with the transfer switch to complete your installation.
.
Generac Power Systems, Inc.
Toll Free: 1-888-GENERAC
www.generac.com
0196980SBY
PN 50927 Rev A
© 2012 Generac Power Systems, Inc. All Rights Reserved. GenTran and Generac are registered trademarks of Generac Power Systems, Inc.
2