Siemens MC2 Instrucciones De Instalación Y Conexión página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Remove signal cable insulation.
2. Cut the braided shield to a length of approx. 15 mm (0.59").
3. Separate the cable core from the foil shield.
4. Remove cable insulation and attach the wire end sleeves.
5. Wind the shield core around the braided shield.
Grounding terminal
Connect grounding terminal (PE) to protective earth
Non-Ex
Note
In compliance to the EMC-standard / low voltage guideline, the terminal box, additional to the meter tube of the flow sensor,
has to be grounded. To make this connection, make use of the included green/yellow cable:
Cut the enclosed cable lug to the shortest required length
Crimp the matching cable lug onto the cable
Join both ends and make sure both screws are securely fastened
Explosion proof instruments should fundamentally be integrated into equipotential bonding
6
Ex
MC2 installation and connection instruction
A5E34730442-001, 07/2014

Publicidad

Tabla de contenido
loading

Tabla de contenido