35"
FLOOR
X
X
X
X
X
A
1
1
2
2
Contact Schön at (800) 880-8164 or visit www.schonsimplymodern.com. Copyright ©2015, World Imports Decorative Plumbing. All rights reserved.
1.
Measure a vertical distance of 31-3/4" from the oor using a tape
measure, and mark on the wall with a pencil. This will be the height
of the wall bracket (C).
WARNING
The vanity is heavy. Two people are recommended for safe installation. The
metal secure mount bracket (C) must be screwed into at least TWO 2 x 4 wall
31-3/4"
studs and secured within 4" of each end of the bracket.
In the event 2 x 4 studs cannot be located within this area, additional
bracing must be installed behind the nished wall as follows. Position the
board between two studs so that the front surface of the bracket is ush
with the front of the studs. The nished wall is then applied over the board.
1.
Place the wall bracket (C) against the wall at this location. Using a pencil,
mark seven locations on the wall that match up with the mounting bracket's
(C) pre-drilled holes. Ensure the marks are horizontally straight by using a level.
D
X
Use a hammer to gently punch an anchor (D) halfway into the wall at each
X
2.
C
E
marked location. Finish screwing in the anchors (D) with the screwdriver.
3.
Align the bracket (C) holes with the anchors (D) against the wall.
insert the screws (E) through the bracket (C) holes and into the anchors (D).
Finish screwing in with the screwdriver.
1.
Lift the vanity (A) above the bracket (C) and place it against the wall.
2.
Slide the vanity (A) to the left or right to the desired location.
3.
Slide the vanity (A) down the wall, hooking it onto the bracket (C).
C
1.
Adjust the top bolt (1) to tilt the vanity from front to back. Adjust the bottom
bolt (2) for leveling the vanity left or right.
2.
After all adjustments are completed, replace the plastic cap.
Esley Wall Hung Vanity
PAGE 3
Installation Instructions