Operating Cycle - Brigade BR11059 Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

General Information
Pre-charged storage tanks can be connected
together to increase the supply of usable water
(drawdown). Two tanks of the same size will double
the supply and three tanks will triple the supply.
See Figures No. 1A and 1B for typical installations
of this kind.
From
Well
Pressure Switch
Figure 1A
Tanks
From
Well
Pressure Switch
Figure 1B
Tanks
To
Service

OPERATING CYCLE

1. Tank nearly empty – air expands filling area
above vinyl water cell
(Fig. 2A).
2. Water begins to enter tank – air is compressed
above water cell as it fills with water (Fig. 2B).
3. Pump-up cycle completed – air now
compressed to cut off setting of pressure switch
(Fig. 2C).
4. Water being drawn from tank – compressed
tank air forces water out of water cell (Fig. 2D).
5. Water cell completely empty – new cycle ready
to begin (Fig. 2A).
WATER
Figure 2
To
Service
CHART II – Water Yield Per Pump Cycle
(drawdown) in Gallons
Model No.
BR11059
BR11061
BR11062
BR11063
BR11064
BR11065
A
WATER
C
WATER
Pressure Switch Setting (PSI)
20-40
30-50
6.9
11.6
18.3
15.5
21.4
18.3
30.0
26.0
41.3
35.4
3
B
D
40-60
5.8
5.0
9.8
8.5
13.4
16.0
22.0
31.0

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Br11061Br11062Br11063Br11064Br11065

Tabla de contenido