7 Commissioning
Turn on the electrical supply to the boiler and timer
and commission as detailed in the instructions for
installation supplied with the boiler.
7 Commisssioning
The CE Mark demonstrates that the room thermost-
at fulfills the essential requirements of the Low
Voltage Directive (73/23/EEC).
We do not accept any liability for damage airing
from non-observance of these instructions.
GB
11