Before starting the assembly process, unpack all components of the staircase. Lay them out on a large surface and
check the quantity of all the pieces, by consulting the table TAB.1 (A = Code, B = Quantity).
Inside the staircase box you will also find a DVD which we suggest watching before proceeding to assemble.
For customers in the USA there is a customer assistance number 1-888 STAIRKT, which you can telephone in case
of problems.
Preliminary Assembly
1.
Assemble the parts C24, C25 and B20 to the treads (L03) (fig. 2).
2.
Carefully measure the floor-to-floor height and determine the required number of spacers (D08) (TAB.2) and
prepare them onto their proper spacer (D15) (TAB2)
3.
Assemble the parts C63, C65, C66 onto the baluster (C03), by using the part B68 (fig. 3).
4.
Assemble the base G03, B17 and B46 (fig. 1).
Assembly
5.
Determine and mark on the floor the centre of the opening, then position the base (G03+B17+B46) (fig. 4).
6.
Drill with drill bit Ø 14 mm (
7.
Screw the pole (G02) into the base (G03+B17+B46) (fig. 1).
8.
Insert the base plate cover (D12) into the pole (G02) (fig. 5).
9.
Insert the spacers (D08), then the shorter spacer (D14), the spacers (D08), the first tread (L03), the spacers
D08), the spacer (D15), the spacers (D08) and another tread (L03) and so on. Add alternatively the treads
alternately one to the right and one to the left, so as to distribute the weight in a balanced way (fig. 5).
10.
When you reach the end of the pole (G02), screw the part B47 on it, then add the second pole (G02) and
continue with the stair assembly (fig. 5)
11.
When you reach the end of the pole (G02), screw on it the part B46 and the part G01. (Screw the part G01,
until its upper end sticks out approximately 15 cm (6'') from the stair height (fig. 6). Continue adding the treads,
by using the part D01 inserted into the tread (L03).
12.
Finally add the stair landing (E02). After having chosen the stair rotation (fig. 7), position the landing (E02) with
the small hole (which is needed for the baluster passage (C03)) on the arrival side of the treads (L03) (fig. 8)
Cut the landing (E02), if necessary, in relation to the floor opening.
13.
Insert the parts B05, B04 and screw the part B03 sufficiently (fig. 1) but keeping in mind that the treads still
have to be rotated (fig. 1).
Fitting of the Landing
14.
Approach the part F12 to the floor. Determine the position, maintaining a distance of about 15 cm (6") from the
external side of the landing (E02), pierce with drill bit Ø 14 mm (9 / 16") and fix securely by using the part B13 (fig. 1).
15.
Fix the parts F12 to the landing (E02), by using the parts C58 (pierce the landing (E02) with the drill bit Ø 5 mm (
16.
Position the parts B95.
Assembly of the Railing
17.
Spread-out the treads (L03) fan-like. It is now possible to use the stair.
18.
Starting from the landing (E02), insert the longer railing balusters (C03), that build the connection between the
treads (L03). Keep the balusters (C03) with the part C63 and the pierced part to the top (fig. 8). Tighten only the
part B20 of the lower tread (fig. 2).
19.
Check very carefully the vertical position of the inserted balusters C03. This control is very important for
insuring the best results.
20.
Tighten securely the part B03 (fig. 8).
21.
Tighten securely the part B02 of the upper tread (fig. 2).
22.
Check once more the vertical position of the railing balusters (C03) and, if necessary, correct it, by repeating the
previous operations.
23.
Position the first baluster (C03). Cut one long baluster (C03) to obtain the same size as all others you
assembled previously.
24.
Fix into the floor in relation to the first baluster (C03), the part F01, by piercing with the drill bit Ø 8 mm (
Use the parts C58, B12, B83 and B02 (fig. 1). Then assemble the reinforcing part (F07).
25.
Find the handrail piece not marked in red colour (A13) and the one marked in red colour (A14) which will be
used for the railing of the landing (E02) (fig. 9).
9 / 16") and fix the base (G03+B17+B46) into the floor by means of the parts B13 (fig. 1).