7 . I N S T A L L A T I O N A N D O P E R A T I O N
1. Checking
When you receive your equipment, open the packaging and check that your UPS has not been
damaged. Packaging includes:
Z1 Zenergy Cube EX 400/600 VA : UPS unit and a user guide.
2. Charging the batteries
This unit is shipped from the factory with its internal battery fully charged, however, some charge
may be lost during shipping and the battery should be recharged prior to use. Plug the unit into an
appropriate power supply and allow the UPS to charge fully by leaving it plugged-in, with no load,
for at least 8 hours.
The UPS will automatically recharge its own batteries whenever the switch is in the "ON" position
("ON LINE" green LED on). You may use the UPS immediately, however the back-up power
capacity may be lower than the nominal value required.
3. Placement & storage conditions
The UPS has been designed to operate in a protected environment, at temperatures between 0°C
and 40°C and at a humidity level ranging between 0% and 90% (no condensation).
Do not obstruct the ventilation slots. Install the unit in an environment, which is free from dust,
chemical vapours and conductors. Moreover, in order to avoid any interference, keep the UPS at
least 20cm away from the CPU (central processing unit).
4. Connection
Check the identification plate at the back of the UPS to make sure that the power supply is
compatible with network voltage and that the device is powerful enough to protect the given load.
Plug the UPS into a 2-pole, earthed outlet. Then, connect computer-related devices to the UPS.
5. On/Off
To turn the UPS unit on, lightly press the power switch. To turn it off, press the power switch
again. Make sure that the power switch is kept in the "ON" position, otherwise the UPS will be
disabled and your equipment unprotected in the event of power failure.
Note: For maintenance purposes, please turn the UPS on before the PC and other loads, and turn
it off after the connected loads are turned off.
6. DC Start
Z1 Zenergy Cube EX units are equipped with an integrated DC start function. To start the UPS in
the absence of a power supply and with a full battery, simply press the button.
INFOSEC UPS SYSTEM - 15, rue du Moulin - 44880 Sautron - FRANCE - www.infosec-ups.com
6
Hot Line – Tel + 33 (0)2 40 76 15 82 - Fax + 33 (0)2 40 94 29 51 - hotline@infosec.fr – 05 18 AA 59 205 01