Klarstein LUMINANCE STEAM Manual De Instrucciones página 49

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Installation dimensions
Ventilation grid
Note: There should be gap above the oven.
Building in
Do not hold or carry the appliance by the door handle. The door handle cannot hold
the weight of the appliance and may break off.
1. Carefully push the oven into the box, making sure that it is in the centre.
2. Open the door and fasten the oven with the screws that were supplied.
25
• Fully insert the appliance and centre it.
• Do not kink the connecting cable.
• Screw the appliance into place.
The gap between the worktop and the appliance must not be closed by additional
battens.
min 45
min 45
Cupboard feet
10
50
460
Ventilation openings
behind, min 250 cm
2
Back
panels
opening
EN
49

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

10032639

Tabla de contenido