Installation Method - Samsung SVM-0200 Manual Del Usuario

Multi panel
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
Installation

Installation Method

1. It is recommended to mount the flush Box at the height of average adult's eyelevel from the ground
2. Mount front panel on the flush Box with provided hexagonal screws.
3. Assemble each side mounting bracket on the front panel with provided hexagonal screws.
4. Leave the front panel unattached on the wall before you make sure all the stations have been
installed and wired properly.
6
Wiring
I
Monitor Connection
Plug wires(from tenant monitor) into connectors on the camera
respectively according to illustrated diagrams as below.
Connection to VDP
No.
Color
Remark
1
Red
POWER_ON
2
Blue
VOICE
3
White
VIDEO
4
Black
GROUND
Power Connection
Open Door Connection
Note :
1. The connection between wires and connectors
should be completed in the reverse side of your
desired call buttons
2. No additional system set-up is necessary after
wiring
7

Publicidad

Tabla de contenido
loading

Tabla de contenido