Uline H-9527 Guia De Inicio Rapido página 2

Fregadero para trapeador
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Figure 3
SUB-FLOOR INSTALLATION
Sub-Floor
Joist
3. Set unit in place and ensure it is level.
4. Measure in approximately 2⁄" from each end of
unit along horizontal center line. Draw a light line
on wall along the edge/rim of unit and temporarily
remove mop basin. (See Figure 4)
Figure 4
MOP BASIN
2⁄"
Wall
PAGE 2 OF 9
INSTALLATION CONTINUED
6"
Top of drain pipe
1/4" below top of
sub-floor
2 or 3" Sanitary
Drain Pipe
Edge/Rim
Edge/Rim
2⁄"
Wall
5. Measure down 1⁄" to horizontal center line for
anchoring brackets. Drill pilot holes for mounting
screws and attach anchoring brackets to wall.
Set mop basin back into place. Apply a bead of
silicone sealant after installing basin. (See Figure 5)
Figure 5
Wall
1⁄"
Mounting Screw
(not included)
6. Seal waste by installing drain seal around waste
pipe. A light coating of liquid soap on drain seal will
make installation easier. Tamp drain seal in place
to bottom of drain body using a 1/4" diameter rod.
Ensure drain seal is even with top of waste pipe
and in full compliance with local codes regulations.
Snap strainer into place. (See Figure 6)
Figure 6
Mop Basin
3" Drain
Seal
7.
Use a quality silicone sealant (not included) along
edges of mop basin to make contact with walls.
Silicone Sealant
Rim
Anchoring Bracket
Stainless Steel
Strainer
1/4"
3" Sanitary
Floor Drain
6"
0721 IH-9527

Publicidad

Tabla de contenido
loading

Tabla de contenido