CMP DEL OZONE 25 Manual Del Usuario página 7

Ocultar thumbs Ver también para DEL OZONE 25:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2 INSTALLATION
Locate an appropriate section of the return line and install the injector
manifold with PVC cement. Be very careful to observe and follow the
correct water flow direction (as indicated by the arrow on the injector
manifold).
2C-2. Water Line Check Valve
If the pool equipment is mounted above the water line, a check valve
must be installed between the pump outlet and the injector manifold.
This will prevent the pump from draining and losing its prime (when
not in use). CMP HydroSeal™ check valve recommended.
2C-3. Pressure Test
If a pressure test is required, it should be performed prior to
connecting the ozone gas line. Install the 3/4" pipe cap provided onto
Add an arrow that points to the join of the
green ozone tube to the assembly, and
the injector for the pressure test.
entitle it "Flow Meter Assembly:
Flow Meter
Assembly
Injector
Assembly
Figure 3a: Flow Meter Assembly
4
Tube
Adaptor

Publicidad

Tabla de contenido

Solución de problemas

loading

Productos relacionados para CMP DEL OZONE 25

Este manual también es adecuado para:

Del ozone 50Del ozone 100

Tabla de contenido