Sabiana UP-TOUCH Instrucciones De Uso página 25

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

UP-ECO POWER UNIT INSTALLATION for CB-E control
» Purpose
WE RECOMMEND THAT YOU READ THESE
INSTRUCTIONS CAREFULLY BEFORE USING THE
CONTROL.
The CB-E control allows the device to be
switched on or off (Stand-by) and therefore to
easily set the ventilation by progressively acting
on the fan speed, leaving the temperature
control
to
a
centralised
thermostat which, in addition to enabling fan
operation, will also control the opening and
closing of the water valve on the connection
pipe.
» Assembly of the power unit
Instructions for installing the power unit when not factory installed.
The basic units, supplied without controls, are equipped with an electrical terminal board prepared for
connection to external controllers.
To install the power unit proceed as follows:
1. It is necessary to remove the cable fastener (1)
and the terminal board group with the related motor
cables (2) from the right side of the fan coil unit
programmable
1
2
Always disconnect the electrical
power supply before opening the unit.
2. Remove the terminal board applied on the
shoulder by unscrewing the two self-tapping screws.
The two holes shown in the figure are those that will
then be used to fix the power board.
25
English

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Up-eco

Tabla de contenido