Getting Started; Status Indication - alfen Eve Single Guía De Instalación Rápida

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 11
Installing
1
Remove the front cover.
Place the Eve Single with the front cover facing
downwards.
Use the box as a base, to avoid damaging the
Eve Single.
Remove the mounting bracket.
Unscrew the six T20 screws.
Turn the Eve Single over again.
Pull the front cover straight upwards.
For wall mounting only:
2
Fit the mounting bracket.
Drill the holes.
Use the mounting bracket as a template to mark
the holes.
Fit the wall plugs.
Secure the mounting bracket with the 4 screws.
Ensure the wall plugs and screws are suitable
for the type of wall.
3
Fit the Eve Single.
Position the Eve Single on the mounting bracket or
mounting pole.
Do not drop the Eve Single. Keep hold of the
Eve Single with one hand.
Tighten the four M8 washers and nuts.
Fit the earth cable under the bottom right-hand
washer and nut.
4
Remove the frame and the plug connection.
Unscrew the three T20 screws.
Do not damage the power cables. Leave the
frame hanging carefully next to the housing.
For control management via SIM only:
5
Fit the SIM card.
For control management via the internet only:
6
Connect the ethernet cable.
Feed the cable through the gland.
Connect the cable.
Tighten the gland.
Ensure the cable is clamped firmly in the gland.
Only then will the IP55 sealing be effective.
7
Connect the power cable.
Make sure the power cable is not live.
Feed the cable through the gland.
Connect the cores to the terminals.
Tighten the gland.
Ensure the cable is clamped firmly in the gland.
Only then will the IP55 sealing be effective.

Getting started

Only for model with charging cable:
8
Connect the charging cable.
9
Connect the CP cable.
Feed the cable through the gland.
Connect the cores to the terminals.
Ensure the phases are connected to the correct
terminals.
Connect the CP cable to the connector.
Tighten the gland.
Ensure the cable is clamped firmly in the gland.
Only then will the IP55 sealing be effective.
10 Put the frame back in place.
Tighten the three T20 screws.
Take care not to damage the cables; keep them
clear of the locking mechanism so they do not
obstruct it.
11 Refit the front cover.
Place the front cover on the housing.
Tighten the six T20 screws on the back.
Avoid dropping the front cover. Keep hold of
the front cover with one hand.

Status indication

Pro-line
Charging pass accepted, cable connected.
Communicating with vehicle, or charged and
ready to use.
Charging transaction active, with indication
of charging rate.
Error message, with error code.
S-line
Green
Cyan
Blue
(steady)
Blue
(flashing)
Blue-Cyan
(alternating)
Red
5
Charging pass accepted,
cable connected.
Communication with
vehicle, or charged and
ready to use.
Charging transaction
active.
Load balancing activated.
Charging at reduced rate.
Load balancing activated.
Charging paused.
Error message.

Publicidad

Tabla de contenido
loading

Tabla de contenido