Cebora GRV 12 Manual De Instrucciones página 7

Grupo de enfriamiento
Ocultar thumbs Ver también para GRV 12:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 14
4
MOTOR PUMP TECHNICAL SPECIFICATIONS
U1 230V
Frequency
Input power
Input current
Motor revolutions
Max. capacity
Max. head
Frequency
Input power
Motor revolutions
Max. capacity
Max. head
5
MAINTENANCE
Before carrying out any inspection inside the cooling unit, turn the unit off using switch (A) also disconnecting
the power cable from the electrical mains.
Daily maintenance
It is good practice to carry out the following maintenance operations every day:
Check the water level, adding fluid as necessary.
Check there are no leaks in the cooling water pipes.
Six-monthly maintenance
It is good practice to carry out the following maintenance operations every six months:
Blow out any dust and dirt using compressed air. Clean the cooling radiator particularly thoroughly.
Check the tightness of fittings, cables and connectors.
Change the coolant and flush the cooling system with clean water before adding new coolant.
5.1
Procedures to follow when repairs have been made
After making repairs, ensure that the wiring is arranged in such a way as to guarantee the insulation of parts connected
to the supply circuit from those connected to the low tension circuit.
Make sure that the wires cannot come into contact with moving parts, or any parts which heat up during operation.
Replace all clips, as on the original machine, so that if a lead accidentally breaks or is disconnected, a contact
between the supply circuit and the low tension circuits is impossible.
3300948/C
50 Hz
200 W
1 A
2850 rpm
7 liters/min.
3 Bar
60 Hz
270 W Input current = 1.2 A
3300 rpm
8,5 liters/min
4 Bar
7/7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

1683

Tabla de contenido