GB
Instructions for use: Visign for Style/Visign for More actuating panels
B
Components
Inspection chamber
Base plate, Visign for More
100 / 102 / 103 / 104
Cover for chamber
C
Installation
The actuating panels can be located on the front or top of the cistern modules.
The installation procedure is identical for both locations. We recommend that you wait until the wall
finish is complete before install ing the actuating panels.
Installation procedure
Remove the chamber
cover.
Remove the cover and
take out the threaded
bolts. You can dispose of
the cover.
Slide the Bowden wire unit
onto the drain valve from
the left until it snaps into
place.
The Bowden wires clip onto
the rear of the base plate.
Match up the colours. Line
the green Bowden wire up
with the slot marked with
a green dot.
Note:
Visign for Style 11 (model 8331.1) and 12 (model 8332.1) actuating panels can be fitted with anti-theft
protection as an optional extra (model 8330.15).
518914_Visign_f_Style.indd 29
Set of threaded bolts
Base plate,
Visign for More 101
Cut in the corners of the
inspection chamber as far
as the surface of the wall.
Unlock the mechanism
and unhook the bar from
the drain valve.
Reinsert the support and
open the corner valve.
Fit the base plate and
secure with the screws
supplied with the kit.
29
Base plate,
Visign for Style 11 and 12
Bowden wire unit
Snap off and dispose of the
ends. The edge of the
inspec tion chamber must
be flush with the surface of
the wall.
Remove mechanics, take
out the bracket. Remove
the U-bolt on the drainage
valve. Mechanics and U-bolt
are no longer required.
Insert the two threaded
bolts into the bore hole
inside the inspection
chamber and lock them in
place by turning through
90°. Note the required
dimensions: 20 mm between
the leading edge of the
threaded bolt and the
leading edge of the wall.
Finally, fit the actuating
plate to the base plate.
28.03.2011 16:51:58