Operation of SensoPilot Pro
Power supply
• Before using the SensoPilot, ensure the batteries are fully charged.
• If LEDs 6 / 7 / 8 blink from inside to outside, the batteries need recharging. To do
so, remove the cover of the charger socket (1) and connect the charger.
Recharging takes approx. 15 hours.
• Alternatively, the SensoPilot can be operated and be recharged at the same time
from the battery of the construction machine via the 12/24V battery cable. To do
this, plug the battery cable into the socket (4).
• When no laser beam is being received, the SensoPilot switches itself off automati-
cally.
Fixing the SensoPilot Pro
The powerful magnets (9) allow the SensoPilot to be fixed directly on the construc-
tion machine. Take care that the contact surfaces are clean and level so as to ensure
that the magnets have a firm and reliable hold.
Putting the SensoPilot into operation
Press the ON / OFF switch once; all the LEDs will flash briefly. The SensoPilot is now
ready for operation. The large oblong receiver fields (5) recognise the laser beam, and
the LEDs (6, 7, 8) indicate when the reference height is reached.
• Upper LEDs blinking: Move the SensoPilot upwards.
• Middle LED (6): The SensoPilot is at reference height.
• Lower LEDs blinking: Move the SensoPilot downwards.
Precision select
Two levels of precision (HIGH and LOW) can be selected. Changeover between the
precision levels is done using the On / OFF switch (10).
• HIGH: The inner LEDs (7) blink 3 times.
• LOW: The outer LEDs (8) blink 3 times.
Switching off the SensoPilot
Press the ON / OFF switch (10) for about 3 seconds.
Rotation laser
For generating a laser reference height, automatic rotation lasers with a high maxi-
mum rotation speed are best. Laserliner offers a wide range of suitable high-quality
lasers, e.g. the AutoControl-Master ACM. However, rotation lasers of other makes
can also be used. Ask your specialist dealer or UMAREX-Laser for advice. Additional
information can also be found at www.laserliner.com.
ENGLISH
SensoPilot Pro
9