Descargar Imprimir esta página

Haldex PURest Guia De Instalacion página 2

Ocultar thumbs Ver también para PURest:

Publicidad

Idiomas disponibles

Idiomas disponibles

!
When working on air system components the following precautions
should be observed.
1. Stop engine when working under a vehicle. Always block the
vehicle wheels to prevent a fore or aft roll. Bleeding off system
air pressure may cause the vehicle to roll. Keep hands away
from brake chamber push rods and brake adjusters; they may
apply as system pressure drops.
2. Never connect or disconnect a hose or line containing air
pressure. It may whip as air escapes. Never remove a
component or a pipe plug unless you are certain all system air
pressure has been exhausted.
3. Never exceed recommended working air pressure and always
wear safety glasses when working with air pressure. Never look
directly into component ports or direct a pressurized air flow at
anyone.
4. Never attempt to disassemble a component until you have read
and understood all recommended procedures. Some
components contain powerful springs and injury can result if not
properly disassembled. Use only proper tools and observe all
precautions pertaining to the use of those tools.
Turbo-Saver
TM
Quantity
1
1
1
1
NOTE: Servicing of the Turbo-Saver™ can be accomplished without
removing the PURest Air Dryer from the vehicle.
Lubricate all o-rings and seals with included grease prior to assembly.
WARNING
PURest
Repair Kit (DQ6052)
Description
Piston
Piston O-Ring (1/2 ID)
End Cap O-Ring (3/4 ID)
End Cap
TURBO-SAVER™ VALVE
INSTALLATION INSTRUCTIONS
DRAIN ALL AIR FROM THE VEHICLE
RESERVOIRS BEFORE YOU BEGIN
THIS PROCEDURE.
1. Remove control port end cap and discard.
2. Disconnect the inlet air line from the dryer.
3. Insert a long shank screwdriver into the inlet port and press the
Turbo-Saver™ piston out through the control port and discard.
4. Install small lubricated o-ring on the Turbo-Saver™ piston body.
5. Lubricate the control port bore.
6. Through the control port opening, insert the new Turbo-Saver™
piston.
7. Install a new lubricated o-ring on control port end cap from
kit and thread into dryer. Torque to 35-50 ft. lbs.
8. Reconnect inlet and control air line.
Inlet Port
End Cap
Control
Port
Turbo-Saver
Piston

Publicidad

loading

Productos relacionados para Haldex PURest

Este manual también es adecuado para:

Da34160