INSTALLATION
1 Trace the position of the anchor holes on the base plate. Remove the
column.
2 Drill the holes with a diameter of 8 mm, along the length of the
anchors.
3 Insert the anchors.
4 Inject chemical anchor into the holes, starting from the bottom if
necessary to secure the anchor.
5 Position the column and check that the holes are aligned with the
holes in the plate.
6 Begin to secure it, tightening at least 3 screws.
7 Loosen the screws. Remove the column.
8 Connect the supply pipes to the caps. 1/2" F of the flexible hoses.
9 Slide the pipes inside the corrugated sheath.
10 Connect the free ends of the supply pipes to the corresponding shut-
off keys located in the inspection recess. Install, if provided, external
taps.
11 Test the static seal of the system with the mixers/taps closed.
7
8
9
12 Position the column. Insert the screws and then tighten them with
the screwdriver. Check the verticality of the column by placing a spirit
level on the vertical pipe. In the case of unevenness, loosen the nuts
and insert a suitable shim between the plate and the floor.
13 For the LILITH column cover the screws with the supplied hole caps.
For the EVA column cover the base with the trim supplied.
14 Insert the accessories supplied separately (hose and hand shower,
foot wash shower attachment if supplied).
4
2
10
-9-
ENGLISH
3
1