Lamborghini Caloreclima EL_DB E Manual Para La Installación Y El Mantenimiento página 16

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 40
Control panel
Screws
Assembling the control panel (figure 2)
Lifting up the boiler lid, you can assemble the
boiler control panel.
Secure the panel using the 4 screws supplied, as
shown in figure 2.
To access the terminal block inside the panel,
unscrew the panel screws (fig. 2).
Connection to the flue
The unit must be connected to a flue designed and built in compliance with current regulations.
The pipe between the boiler and flue must be made from material suitable for the purpose, i.e. heat and
corrosion resistant. Ensure the seal at the joints and insulate the entire pipe between boiler and flue, to
UK
prevent the formation of condensate.
16
Panel screws
Fig.2
1
3
4
Routing the cables (figure 3)
To secure the cables and temperature probes, pro-
ceed as follows:
- Route the power cables, burner cable, tempera-
ture probe, safety probe and thermometer probe
through the fairlead (1).
- Insert the probe into the sheath probe holder (2)
with the two contact plates (8)
- Secure the power cable (3) using one of the fairle-
ads supplied (4).
- Route the burner power cable along the side of
the boiler and secure it using the fairlead (5).
- Wire the burner connector (7) (supplied with the
burner) on the burner cable (6), following the wiring
diagram.
2
8
7
Fig.3
6
5

Publicidad

Tabla de contenido
loading

Tabla de contenido