PREPARE SITE
A. REMOVE OLD BATH
Disconnect the drain at the trap.
Remove the old wall material. Slip
boards under the old bath feet
to protect the floor, and slide the
old bath out of the recess as
illustrated.
B. PREPARE SUBFLOOR
Inspect the flooring under the bath,
and make repairs as needed. Make
sure the subfloor is level.
C. CONSTRUCT STUD FRAME
Possible stud frame arrangements
are illustrated below. Use the stud
construction appropriate for your
particular bath model. Some
modifications may be needed for
other types of construction.
Construct the 2x4 stud frame
according to the roughing-in
information packed. Be sure the
framing is square and plumb.
For an apron wall without a ledge,
the finished apron wall surface must
be at least 1/16" (2mm) under the
bath rim.
CAUTION: Risk of product
damage. Do not hang the bath
by the rim.
1. Recommended For Integral
Flange Model installations:
Kohler Co.