Uline JUMBO H-1229 Instrucciones De Montaje página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 3:
• Position roof assembly on top of shed walls.
(See Figure 6)
• Position the bottom hinge pin of left door panel (G)
into left hole on floor panel. (See Figure 6)
• Lift roof slightly on left side and insert left door
panel (G) top hinge pin into hole on roof panel.
(See Figure 6)
• Repeat with right door panel (H). (See Figure 6)
G
Figure 6
PAGE 3 OF 15
ASSEMBLY CONTINUED
Step 4:
H
• Secure roof assembly to side panels by inserting
4 screws into dimples on the interior header (See
Figure 7) and 10 screws into the dimples around the
interior roof perimeter. (See Figure 8)
Figure 7
Figure 8
0421 IH-1229

Publicidad

Tabla de contenido
loading

Tabla de contenido