E L E C T R O N I C C I R C U I T S
It allows to execute very accurate timing, between 25 and 96 Hours.
It could be activated by pulsation (push button) as well as by Power Supply (supplying the module).
It includes protection against inversion polarity, operating Leds and connection terminals.
TECHNICAL CHARACTERISTICS.
Voltage. ..............................................................................................12 V. D.C.
Minimum Consumption. ....................................................................10 mA.
Maximum Consumption. ...................................................................60 mA.
Minimum Timing. ...............................................................................25 hours.
Maximum Timing. ..............................................................................96 hours.
Maximum Output Load. ....................................................................5 A.
Protection against inversion polarity, (P .I.P .). .........................................Yes.
POWER SUPPLY AND INSTALLATION.
POWER SUPPLY. The I-216 circuit had to be supplied by a 12 VDC (from 9 till 18) power supply correctly
filtered. We recommend you to use the FE-2 power supply which has been developed to perfectly answer to
the circuit needs. Install a fuse and a switch has it is indicated on the schedule. Both are necessary for the
module's protection as well as for your own safety, as it is required by the "CE" regulations. Connect the
positive and the negative of the power supply to the respective positive and negative terminals of the
module, indicated in the wiring map. The distance between the power supply and the module has to be as
short as possible (maxi. 50 cm). Verify that the assembly is correct.
Note. Connections indicated as 230 VAC in t
Americans countries. Cebek's Modules and/or transformers will be supplied with corresponding modifications
for their connection in these countries.
OUTPUT CONNECTION. LOAD. The I-216 output is controlled by a relay, and accept any device up to 5 A.
The relay is not a component supplying voltage but its function is limited to accept or deny the voltage
passage like a standard switch. For this reason, you have to supply the load through this component.
The relay has three output terminals: The normally open quiescent (NO), the normally closed quiescent (NC)
and the common. Install the load between the Common and the NO in accordance with the schedule
"Output Connection. Load". For the inverse function you have to place the load between the NC and
Common.
ACTIVATION. See the General Wiring Map. The module could be activated by pulsation or by power supply. If
you close or join the JP1 Jumper, each time you supply the
module, automatically the timing will be activated. In the
opposite case, if you leave it as supplied from factory, the
module will be activated only when you press the push
button.
To activate the module by pulsation, you have to install a
quality push button on the terminal indicated as "Start". To
connect it, you have to use shielded cable and connect its
braid to the negative sign of the push button input.
Nevertheless, even using shielded cable, the maximum
TIMING.
TIMING. To adjust the timing, you have to use both DIP mico-switches included on the module. Each DIP has
6 switches, which according to their position, ON or OFF, will configure the module in one or an other way.
On the DIP1, switches Nº 1, 2 and 3 will compose, according to their binary combination, 8 different time
scales. In this same way, switches Nº 4, 5, and 6 and all of the DIP2 will allow to select the exact operating
Fig. 2. Switches Function
DIP1
1 2 3 4 5 6
Times Scale
time (See Fig.2).
Every one of the 8 scales offers 9 different time selections according to position of switches 1, 2 and 3 from
DIP1, the rest of switches from DIP1 and DIP2 will allow to select one or other hour.
To select the time scale that you need, you have to combine switches 1, 2 and 3 from DIP1 according to
the Fig.3. Once the scale selected, you have to select the exact operating time, placing the corresponding
Fig. 3. Times Scales
DIP1
Switches
1
2
3
Switches
Off
Off Off
Scale 1
Off
Off
On
Scale 2
Off
On
Off
Scale 3
Off
On
On
Scale 4
On
Off
Off
Scale 5
On
Off
On
Scale 6
On
On
Off
Scale 7
On
On
On
Scale 8
switch in ON position (See Fig.3).
Regarding all switches from DIP2 and switches 4, 5 and from DIP1, only one switch has to be in ON
position. If there were several switches on the ON position, or if all switches were in OFF position, the
module would identify the selection as wrong and wouldn't start the timing.
In order to better understand how to adjust the timing, we
communicate you two samples:
First Sample. To adjust the timing at 25 Hours.
Firstly, you have to select the scale 1, which will allow this
time. On the DIP1, place the switch 1, 2 and 3 in OFF
position.
Then, you have to select the hour Nº25 placing from DIP1
the switch 4 in ON position. The rest of switches have to be
in OFF position (see Fig.4).
Finally, in order to confirm that the selected hour is an
exact hour, you have to place quarters at zero (0) placing
on DIP1 the switch 3 in ON position. (See Fig. 5).
Second Sample. To adjust the timing at 32 Hours.
Firstly, you have to select the scale 1, which will allow this
time.
On the DIP1, place the switch 1, 2 and 3 in OFF
I-216
I-216
1 - 4 Dyas ACCURATE TIMER.
he wiring map
have to be connected to 110 VAC. in
Fig. 1. To configure JP1 Jumper.
Jp1
Jp1
Activation by
Activation by
Pulsation
Power Supply
DIP2
1 2 3 4 5 6
To select Hours
DIP1
DIP2
4
5
6
1
2
3
4
25h.
26h.
27h.
28h.
29h.
30h.
31h.
34h.
35h.
36h.
37h.
38h.
39h.
40h.
43h.
44h.
45h.
46h.
47h.
48h.
49h.
52h.
53h.
54h.
55h.
56h.
57h.
58h.
61h.
62h.
63h.
64h.
65h.
66h.
67h.
70h.
71h.
72h.
73h.
74h.
75h.
76h.
79h.
80h.
81h.
82h.
83h.
84h.
85h.
88h.
89h.
90h.
91h.
92h.
93h.
94h.
Fig. 4. To select the timing at 25 h.
ON
DIP1
TIMING.
Fig. 5. To select the timing at 32 h.
ON
DIP1
Firstly, you have to select the scale 4, which will allow this time. On the
DIP1, place the switch 2 and 3 in ON position, and the switch 1 in OFF
position.
Then, you have to select the hour Nº55 placing from DIP2 the switch 1 in
ON position. The rest of switches have to be in OFF position (see Fig.6).
Fig. 7. To select the timing at 96 h.
ON
DIP1
OPERATING MODE.
After the installation and the operating timing selection, the module is ready to be used.
Activate the power supply switch. The Power Led will light indicating a correct module's supplying.
If you have selected an activation by power supply, the module will start the timing. In the other option, the
module will wait that you press the push button.
Once the timing started, in both options (by pulsation and by power supply), the relay will be immediately
connected, activating the output and the Timer Led. The output will be maintained till the end of the timing.
During a timing cycle, the I-216 module doesn't accept any re-start. You have to wait the end of the cycle
or disconnect the power supply.
Note. If the module is correctly supplied, but doesn't start the timing, you have to check if both DIP micro-
switches have been correctly configured.
GENERAL WIRING MAP.
0
0
15 V. A.C.
0
Module
FE-2
Led
12 V. D.C.
5
6
32h.
33h.
OUTPUT CONNECTION. LOAD.
41h.
42h.
50h.
51h.
12 V DC CONNECTION
59h.
60h.
68h.
69h.
Common
77h.
78h.
Normally Closed, (NC)
86h.
87h.
Normally Open, (NO)
95h.
96h.
12 V. D.C.
INFORMATION ABOUT THE OUTPUT. During the operating mode and according to its load, it could happen
a
fluctuation or an incorrect working of the
output. In such case, you have to install an
anti-spark circuit between both contacts of
the used relay, as it is indicated on the
TECHNICAL CONSULTATIONS.
If you have any doubt, you could contact your wholesaler or our Technical Department.
ON
- E-Mail, sat@cebek.com | Fax. 93.432.29.95 | by mail. P .O. Box. 23455 - 08080 Barcelona - Spain.
- Keep the invoice of this module. For any repair, the corresponding invoice had to be added. If the
invoice is not presented together wish this module, the module's warranty will be automatically cancelled.
CEBEK is trade make of FADISEL S.L. more than 300 module's are
DIP2
avaible in stock for any purpose request our CATALOGUE, or visit our
Web. Http://www.cebek.com
position.
Then, you have to select the hour Nº32 placing from DIP2 the switch
5 in ON position. The rest of switches have to be in OFF position (see
ON
Fig.5).
Third Sample. To adjust the timing at 55 Hours.
DIP2
ON
Four Sample. To adjust the timing at 96 Hours.
Firstly, you have to select the scale 8, which will allow this time. On the
DIP1, place the switch 1,2 and 3 in ON position.
DIP2
Then, you have to select the hour Nº96 placing from DIP2 the switch 6
Fuse
250 mA.
230
15
Relay Output
Power Supply
Switch
Nc
No
Common
15
Timer Led
230 V AC CONNECTION
Normally Closed, (NC)
Normally Open, (NO)
Device,
Load.
Common
NC
NO
All the module's CEBEK have 3 years of total warranty in thecnical
Fig. 6. To select the timing at 55 h.
ON
ON
DIP1
DIP2
230 V. A.C.
Push Button
to Activate
Jp1
ON
ON
Power Supply
Module
DIP1
DIP2
I-216
Common
Device,
230 V. AC.
Load.
47W 1/2W.
100nF/400 V.
Device,
Load.
Power Supply
of the Load.
Ref. Full0104