Bartscher 18GN110 Manual Del Usuario página 11

Ocultar thumbs Ver también para 18GN110:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
Assembly
Fig. 3
1. First install 4 upper and lower cross
members to one side part of the
clearing trolley (fig. 1).
Place square washer between the
cross member, side part, and bolt, and
tighten those elements with use of
Allen wrench.
2. Connect 4 cross members with
another side part with use of
washers and bolts as above.
Fig. 1
3. Put the clearing trolley on its side
and install the castors buffers to the
side parts. Finally screw the castors
into the side parts.
Fig. 2
4. Place the clearing trolley on the castors
and check its stability.
5. Clearing trolley may be levelled with use
of castors by screwing or unscrewing
them (fig. 3).
6. After placing the clearing trolley in required
place lock 2 castors with stoppers to prevent
the incidental relocation or falling down.
- 7 -

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

300181

Tabla de contenido