Descargar Imprimir esta página

Uline Н-6572 Instrucciones De Instalación página 2

Portabicicletas circular

Publicidad

Idiomas disponibles

Idiomas disponibles

1.
Drill a 3/8" diameter hole into the concrete, block or
stone to a depth of 3
2. Blow out the dust in the hole.
PAGE 2 OF 6
". (See Inset A)
1
8
Inset B
MOUNTING
3. Drive the spike flush to rack base and into drilled
hole. (See Inset B)
4. Repeat on remaining spikes.
1-800-295-5510
uline.com
Inset A
3⁄"
0920 IH-6572

Publicidad

loading