Work Surface Drilling
1
Locate the center of top.
Mark the position of uprights, according
2
to the type of frame (see below).
Single unit frame (2 uprights)
Structure simple (2 montants)
28"
C L
Steel top
You must add a
cross bar under
each upright.
The WM45-48 light and WM
components that are on 28"
centers are not compatible with
the 48" and 72" wide WS50
shelves.
3
Mark the position of holes.
Without WM14 top reinforcer / Sin superficie con refuerzo WM14
4
Drill holes for
1" screws
Ø 13/64" for steel top /
para superficies de acero
Ø 3/16" for other top /
1"
para las otras superficies
STAINLESS STEEL drilling :
See stainless steel drilling guide R1T (7D00201T) included with the product.
.
Perforación del ACERO INOXIDABLE :
Ver la Guía R1T (7D00201T) de perforación del acero inoxidable que viene con el producto.
rousseaumetal.com
1-800-463-4271
All manuals and user guides at all-guides.com
You can also use WMVN-01 drilling template if you ordered it.
También puede utilizar la plantilla de perforación si usted ha pedido.
Dessus acier
Colocar un travesaño
debajo de cada
montante
Frame with WS50 steel shelf
Estructura con anaquel WS50
44", 56" or/ou 68"
With WM14 top reinforcer / Para superficie con refuerzo WM14
Ø 9/32"
C L
1
Ubicar el centro de la superficie.
Según el tipo de estructura, marcar el lugar de
2
los montantes.
Double unit frame (3 uprights)
Estructura doble (3 montantes)
Be accurate !
28"
Medir con
precisión!
Steel top
You must add a cross bar
under center upright.
C L
3
Marcar los agujeros.
90°
3/8" Deep for laminated top /
de profundidad para superficie de laminado
1" Deep for other top /
de profundidad para las otras superficies
For all top /
Para todas las superficies
Page/Página 2/4
Perforación de la superficie
28"
C L
Superficie de acero
Colocar un travesaño
debajo del montante del
medio.
La lámpara WM45-48 y los
otros componentes WM de 28
c/c no son compatibles con
los modelos con anaquel
WS50 de 48 y 72.
"
4
Perforar para
tornillos de 1"
1"