Front Panel - Klark Teknik VNET2-DANTE BRIDGE Guia De Inicio Rapido

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
28
VNET2-DANTE BRIDGE
3.
Using the two screws removed in 2, attach one mounting bracket loosely to the side of the
Accessory, with the "ear" towards the front, pointing outwards
4.
Repeat 2 and 3 for the other side. Now push the lid towards the back of the unit as far as it
will go then align the bracket ears with the front edge of the lid. Now tighten the screws.
5.
Offer the Accessory with its mounting brackets up to the reverse side of the Mounting Panel,
and fix it in place using the two sets of screws, washers and nuts removed in 1.
POWER
NET
DANTE
Dante
EXT
POE
DATA
SYNC
DATA
BRIDGE
Note that the holes at the rear ends of the brackets may be used as cable tie-off
points if desired.
Operation
Once the Dante Bridge has been connected to the computer/switch and to the audio devices
(and to the power supply if applicable), then there are no further adjustments required on the
unit itself. The indicators on the front of the unit operate as follows:

Front Panel

(1) (2)
(3)
(4)
The EXT Power indicator (1) illuminates when DC power is applied to the EXT Power socket on
the rear of the unit.
The PoE Power indicator (2) illuminates when DC power is provided by a Power Over Ethernet
(PoE) Switch.
The Net DATA indicator (3) illuminates when data is being received from the VNET network.
The Dante SYNC (4) indicator illuminates when the unit is supplied with a Dante Clock signal.
Note that it will not illuminate if the Device is acting as a clock master.
The Dante DATA (5) indicator will illuminate when the unit is receiving control data
over Ethernet.
Quick Start Guide
(5)
29

Publicidad

Tabla de contenido
loading

Productos relacionados para Klark Teknik VNET2-DANTE BRIDGE

Tabla de contenido