ANCHORING TO CONCRETE FLOOR
1. Verify that bulk storage locker is positioned in the
desired location. Mark floor where holes will be drilled.
2. Using a 5/16" diameter masonry drill bit, drill a hole
in all marked locations approximately 2.5" deep.
3. Clean out debris and dust from inside the holes.
4. Insert anchor bolt and anchor sleeve through the
holes in locker and into the drilled hole so that the top
of the sleeve is flush with floor and threaded bolt sticks
out of the floor. Slightly tap down the anchor bolt with
a hammer if needed. (See Figure 8)
Figure 8
5. Slide washer over each anchor bolt. Then tighten nut
until anchor bolt is secure.
NOTE: The following products are optional accessories.
Top
Additional Shelf
PAGE 3 OF 15
SECURING TO FLOOR OR WALL
OPTIONAL ACCESSORIES
Additional Shelf Rail
Back
SECURING TO WALL
1. Verify that bulk storage locker is positioned in the
desired location. Mark wall where holes will go.
2. Drill a hole in all marked locations approximately
1.5" deep.
3. Using a Phillips head screwdriver, mount locker to
wall using (4) masonry screws on each side panel.
(See Figure 9)
Figure 9
#
DESCRIPTION
1
Top
2
Back
3
Additional Shelf
4
Additional Shelf Rail
Short Hex Head Bolt (Not Shown)
Longer Carriage Bolt (Not Shown)
Shorter Carriage Bolt (Not Shown)
Nut (Not Shown)
L-Bracket (Not Shown)
QTY.
1
1
1 (3 Piece)
2
6
4
19
23
6
1120 IH-6897