CONSIDERATIONS FOR INSTALLATION
Ÿ The installation and testing operations must be performed by qualified personnel
in order to guarantee the proper and safe operation of the automatic gate.
Ÿ The company declines any responsibility for damage caused by incorrect
installations due to incompetence and/or negligence.
Set up an electrical multi-duct conduit in the middle of the foundation of the barrier,
corresponding to the central hole (corrugated - diameter 25 - 50mm).
Provide a channel for electrical safety photocells or use photocells battery.
INSTALLATION WITH BASE PLATE (OPTIONAL)
Take the floor plate and bend the brackets as needed. Dig a suitably sized hole in
the ground.
Insert the electrical conduit into the cable conduit hole of the floor plate.
Level and cement the floor plate.
MOUNTING THE BARRIER
Unscrew the two side screws of the upper cover, and remove it; unscrew the four
fastening screws of the stainless steel carters, removing the front carter in an
upwards direction.
Place the barrier on the floor plate and fasten it with the self-locking M12 nuts
supplied.
MANUAL RELEASE
The manual release is mechanical on the
crankshaft, also accessible from the outside.
To release the operator to rotate the cover
plug and insert the supplied key into the
support on the end of the motor shaft and
screw clockwise until it stops, ending the
release maneuver.
INSTALLATION
Hole
cover.
Release
key.