Start-Up Procedure - Zonair3D AIR PRO 2000 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

START-UP PROCEDURE

The equipment is supplied fully factory wired and programmed. It has a
Plug&Play configuration, so no other settings are required.
The unit will start automatically when switched on.
Please see Page 9 of the INSTALLATION MANUAL for the start-up
procedure.
Please contact ZONAIR3D
assistance or spare parts:
Teléfono: + 34 93 551 03 40
www.zonair3d.com
zonair3d@zonair3d.com
Please read the Installation Manual at the following link for
more information:
https://zonair3d.com/manual-air-pro-2000-3000/
customer service if you require technical
TM
AIR PRO 2000-3000
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Air pro 3000

Tabla de contenido