Descargar Imprimir esta página

Nemaxx FCA35X Manual De Usuario página 8

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 62
STEP 2
The brackets position has been marked on the awning set at factory.
Measure the awning width with a ruler and note the bracket position.
Draw a horizontal line in the position of required height as shown in the diagram by using a
long ruler, spirit level and chalk.
Make marks on the wall, through the holes at the base of the bracket.
The quantity of the wall brackets is based on the awning width.
Awning width
Brackets
Bracket
position
All manuals and user guides at all-guides.com
Chalk line ( use spirit level for accuracy )
Patio doors
EN
≤ 3,3m
3,3m-4,5m
2 pcs
Bracket
position
Patio doors
Floor
8
v03 • 07.09.2017
5,5m-6,0m
3 pcs
4 pcs
Bracket
position
KEN001VKM

Publicidad

loading

Este manual también es adecuado para:

Fca40xFca45xFca50xFca60x