Installation Instructions - LF allen + roth LEELAND LLBVT4839D Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list and hardware contents list. If any part is missing or damaged, do not attempt to
assemble the product.
Estimated Installation Time: 10 minutes (24 hours for adhesive to dry).
Tools Required for Installation (not included): Silicone compound

INSTALLATION INSTRUCTIONS

Step 1: Backsplash Installation
1.
To mount the backsplash (B) to the wall,
apply a thin bead of silicone compound (not
included) to the unpolished back side and
bottom of the backsplash (B). Position
backsplash (B) as shown onto vanity top (A)
and against the wall. Clean any excess
silicone compound before allowing to dry.
1
3
B
A

Publicidad

Tabla de contenido
loading

Tabla de contenido