Required Tools - Tecma Nano ECO Manual De Uso

Ocultar thumbs Ver también para Nano ECO:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Raw Water Considerations
■ The Raw Water pump must be securely mounted in a dry, well-ventilated area. It should be mounted not more than 6' at any time above the heeled waterline.
DANGER:
The Raw Water pump must be powered by the toilet relay module. Use of any pump that draws more than 15 amps requires installation of a pump contac-
tor relay. Do not wire pump directly to a D.C. power source so that it is controlled by its pressure-activated switch. If a leak were to occur when wired directly, the pump would
run continuously and create risk of sinking of the boat and loss of life.
■ An in-line strainer MUST be installed to protect the system. Failure to use an in-line strainer may void product warranty.
■ A Vented Loop of proper diameter MUST be installed if – UNDER ANY CIRCUMSTANCE or CONDITION (including heel trim or load):
Toilet is connected to a through-the-hull fi tting and rim of toilet could EVER be in a position below the waterline.
DANGER:
Failure to use a Vented Loop in raw water pump installation sites can lead to water fl owing into the toilet from the outside (siphoning)
which can cause loss of property and life!

Required Tools

1-1/4" hole saw
1 3/4" - 2" hole saw
3-1/2" hole saw
7/16" socket and ratchet or 7/16" wrench
Electric drill
1/8" drill bit
Bezel Installation
When planning the installation be sure to consider:
■ Bezel placement wall thickness
Distance between toilet and bezel; the harness is 12' in length
DANGER
HAZARD OF FIRE:
Fig. F
73 mm
Tecma Nano ECO Owner's & Installation Manual
Always use recommended circuit breakers or fuses. Failure to follow the recommendations can result in fi re.
Bezel Specifi cations
64 mm
46 mm
56 mm
45 mm - 51 mm
(1.75" - 2.0")
Bezel Hole Size
www.thetfordmarine.com
16

Publicidad

Tabla de contenido
loading

Tabla de contenido