Descargar Imprimir esta página

Wolf COB 15 Instrucciones De Montaje página 7

Cambio de platina de regulación
Ocultar thumbs Ver también para COB 15:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 14
Parameter plug
Control PCB cover
Insert the rotary knobs
3062197_201304
Exchange of the COB printed circuit board from
GB
Spacer feet
10. Plug in the cables for the illuminated ring and the eBus. Install
the new printed circuit board after checking that the mains
switch is set to OFF (fully anticlockwise) and the potentiom-
eters are in the centre position.
11. Plug in the cables.
12. Insert the rotary knob for the ON/OFF operating switch, item
no.: 1710215, with the pointer at O.
13. Insert the rotary knobs for hot water temperature selection
and heating, item no.: 1710216, with the pointer at 5. Subse-
quently, carefully turn fully clockwise and anticlockwise. If the
rotary knob cannot be turned fully clockwise or anticlockwise,
it must be pulled off and rotated by 180°.
Control PCB cover, to be inserted between PCB and cable
14. Fit the rear cover again.
15. Fit the controller with the round spacer feet into the corre-
sponding receptacles and engage the 4 latching lugs in the
controller box. Fit the housing cover again.
16. Carry out a functional check:
a) If a parameter plug is fitted, the reset button must be
pressed twice after switching the device on.
b) Make changes to the parameter settings if changes from
the factory settings are necessary.
c) Put the device into operation ► burner switches on
d) Check the function of control accessories.
A functional check must be carried out after replacing a
printed control board. There is otherwise a danger of per-
sonal injuries due to malfunctioning of the heater.
If the parameter HG00 is changed, the burner adjustment
must also be checked.
02/2011 on
7

Publicidad

loading

Este manual también es adecuado para:

Cob 20Cob 29Cob 40