Descargar Imprimir esta página

PoolMaster 72776 Manual De Instrucciones página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

Upright
Pole
1" Coupling
#8 Set
Screw
1
2
Hex Nut
1
• Secure Coupling between two upright poles and secure with 2 Set Screws. (Repeat for other set)
2
• Situate the game on the pool top rail at your desired location. Using the holes in the Rail Connector
as a guide, drill eight ⁄ " holes in the top rail, four holes per connector.
3
• Attach the connectors to the pool and secure with (8) 1" Nuts and Bolts. (Diagram A)
4
• Insert Eyelet into the top holes on the Upright Pole Support (See Eyelet/Pole Detail) and fasten with
Washer and Hex Nut. (Repeat for other side)
5
• Insert the Upright Pole into the Rail Connector, secure with 1¾" Bolts. (Repeat for other side) (Diagram B)
6
• Extend the Net across the pool, pull tight and tie Net Ropes to the top of each pole through the
Eyelets. Net can be shortened by rolling on pole or lengthened by extending the Rope Ties.
7
• Tie net ropes to the bottom of each pole.
8
• Tie two 8ft. Ropes to the Eyelet at the top of the Upright Pole and extend diagonally and tie to the Pool
Upright Support. (Repeat for other side)
6
Cap
Net
Net
7
Tie
1" Bolt
1 ¾" Bolt
3
Rope
Pool Upright
Support
8
Eyelet/Pole Detail
Hex Nut
Washer
4
Connector Detail
Diagram A
5
1" Bolt
w/ Hex
Nut
Pool
Top Rail
Eyelet
Diagram B
1 ¾ " Bolt
w/ Hex Nut
poolmaster.com
2

Publicidad

loading