dormakaba BEST Switch Bridge Instrucciones De Instalación página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

B r i d g e I n sta l l at i o n I n st r u ct i o n s
7
ENTER SERIAL NUMBER IN SWITCH™ DECK
NOTE:
Claiming a bridge (A)
to a site in Switch™ Deck
creates an association between
the site and the bridge (A).
1. Log in to your Switch™ Deck account and claim a bridge (A) to a site using its serial number.
2. Upon claiming a bridge (A), its IP address will be displayed in Switch™ Deck for use in your ACS.
3. Validate that the LEDs are green.
8
BRIDGE POWER UP
NOTE:
The bridge (A) LEDs should display a yellow light after plugging in the Ethernet cables (D).
After the bridge (A) has been claimed to a site in Switch™ Deck, the LEDs will change from yellow
to green. If not, please reference the Switch™ Tech user guide for further instructions.
https://support.bestaccess.com/hc/en-us/articles/360036366673
LED 1
• Yellow: Bridge (A) booted
• Green: Successfully
connected to Switch™
Deck and ready to
connect to ACS
After powering up, the bridge (A) will
automatically attempt to create a connection
with Switch™ Deck. The LEDs on the front
panel will indicate the progress of the boot
process.
BEST is a trademark of dormakaba USA Inc.
Switch™ Deck
Serial Number
XXXXXXX-XXXXX
IP address
IP: XXX.XXX.XXX.XXX
LED 1
LED 1
Front Side of Bridge (A)
5/24
NOTE:
not green, please refer to
the LED lighting information
in step 8.
LED 2
LED 2
• Yellow: Connected to the
LED 2
• Green: Claimed to a site
NOTE:
When both LED's are green, the
system is configured properly and the
bridge (A) installation is complete.
T91406_A ©2020 All rights reserved.
If LED 1 and LED 2 are
Internet/Switch™ Deck
COMPLETE

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

1swbrdg

Tabla de contenido