Disconnecting Hoses; Operating; Pumping; When Taking A Break - Atlas Copco LWP 2 Instrucciones De Seguridad Y De Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 46
Safety and operating instructions
Check the hydraulic oil level
Start the engine and run the power source to fill
up the hydraulic circuit.
Check the hydraulic oil level.

Disconnecting hoses

Prepare the power source
Turn the by-pass valve to the OFF position.
Stop the engine.
Remove the hoses
Rotate the collar on the female coupling.
Release the return line hose.
Release the feed line hose.
Protective caps
Fit protective caps over the ports to prevent
contamination.

Operating

Pumping

Use protective shoes, gloves, helmet, hearing
protection, and impact resistant eye protection
with side protection.
Pump only water with the LWP 2 pump.
Never use the machine to pump drinking water.
Never exceed the max relief valve setting, stated
on the pump.
Never use the pump to extinguish fires.
Never use the pump for pumping media, heated
to more than 80°C.
Never use the pump for pumping explosive media.
Never use the pump for pumping corrosive agents.

When taking a break

During all breaks you must place the machine in
such a way that there is no risk for it to be
unintentionally started. Make sure to place the
machine on the ground, so that it can not fall.
In the event of a longer break or when leaving the
workplace: Switch off the power supply and then
bleed the machine by activating the start and stop
device.
12

Maintenance

Regular maintenance is a basic requirement for the
continued safe and efficient use of the machine.
Follow the maintenance instructions carefully.
Use only authorised parts. Any damage or
malfunction caused by the use of unauthorised
parts is not covered by warranty or product liability.
When cleaning mechanical parts with solvent,
comply with appropriate health and safety
regulations and ensure there is satisfactory
ventilation.
For major service to the machine, contact your
nearest authorised workshop.

Every day

Clean and inspect the machine and its functions
each day before start working.
Conduct a general inspection for leaks, damage,
and wear.
Change damaged parts immediately.
Replace worn components in good time.
Make sure that all the attached and related
equipment, such as hoses and flow dividers are
properly maintained.
Clean the quick-release couplings before use.

Every month

Inspect the hydraulic hoses and fittings thoroughly.
LTP 3 pump only: Remove and clean the base
legs and base plate. Remove any material that
may have accumulated near the inlet port.

Periodic maintenance

After each operating period of approximately 150
impact hours or twice a year the machine must be
dismantled and all parts be cleaned and checked.
This work must be performed by authorised staff,
trained for this task.
© 2010 Atlas Copco Construction Tools AB | No. 3392 5045 90d | 2010-01-01
LWP 2, LTP 3
Original instructions

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ltp 3

Tabla de contenido