Control Panel Assembly - SNOWJOE SUNJOE 24V-MDTCR1-LTW Manual Del Operador

Detector de metales inalámbrico
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Search Coil Assembly
1. Fit the end of the lower pole between the 2 tabs of the
search coil and align the holes (Fig. 5).
Fig. 5
Align the holes
2. Secure them together with the search coil bolt and knob.
Then tilt the search coil to your desired angle and tighten
the search coil knob and bolt to secure it in place (Fig. 6).
Fig. 6
Search coil bolt

Control Panel Assembly

3. Fit the control panel by hooking it on the small hook on
the back of the control panel plate (Fig. 7).
Fig. 7
Control panel
4. Secure it using the control panel bolt. Screw securely to
lock (Fig. 8).
Lower pole
Search coil
5. Curl the search coil cable along the pole, and insert the
Search coil knob
Folding Shovel Assembly
1. Remove the contents from the folding shovel pouch, and
2. Screw the handle into the shaft of the shovel (Fig. 10).
Hook
9
Fig. 8
plug into the DIN connector located on the bottom of the
control panel (Fig. 9).
Fig. 9
unfold the spade and pick. Twist the locking collar to
secure the pick and spade at your desired position.
Fig. 10
Pick
Locking collar
Handle
Control
panel bolt
DIN connector
Cable plug
Search
coil cable
Spade

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido