1.
Prepare the area for installation
Tools / Materials Needed
Tape Measure
String
Stakes
Measure and mark the post locations using string
and line stakes (Fig. 1).
2.
Post installation
Tools / Materials Needed
Shovel
Tape Measure
Level
a.) Dig post holes 8" in diameter and 18" deep
(Fig. 2).
b.) Insert 6" of gravel into the bottom of holes.
Place posts in holes 12" deep (Fig. 2).
c.) Put each post in marked holes (Fig. 3).
TIP: Make sure post heights are level, taking
3.
Side rail installation
Components Needed
Side Rails "A"
a. Install side rails "A" (from End to Corner, Corner
to Corner, and Corner To End Post) (Fig. 4).
b. Ensure lock tabs are inside post (Figs. 5 & 6).
Components Needed
Corner Posts
End Posts
into account ground slope/grade.
Qty.
3
Corner Post
Fig. 5
"A"
"A"
Qty.
2
2
Fig. 6
"A"
End Post
Corner
Post
40
⁄
"
1
2
On Center
End Post
12"
12"
18"
12"
6" Gravel
8"
Corner Post
End Post
End Post
Corner
Side Rails
"A"
End
Posts
Fig. 1
Corner
Post
End Post
Fig. 2
4
⁄
"
1
4
Fig. 3
Corner Post
Fig. 4
Posts
3