ASSEMBLY & INSTALLATION
Before connecting the appliance to a power source, let it stand
upright for approximately 2 hours. This will reduce the possibility of
a malfunction in the cooling system from handling during
transportation.
This beverage cooler is a freestanding unit and should not be built in to
surrounding cabinetry. Allow for proper air clearance around the cooler. The
recommended clearances are as follows:
Sides: ¾" (19 mm)
Top: 4" (100 mm)
Back: 2" (50 mm)
Before operating your beverage cooler for the first time, follow these steps:
1. Clean the interior surface of the unit with lukewarm water and a soft cloth.
2. Place the cooler on a level surface that will be strong enough to support
the unit when it is fully loaded. To level your cooler, adjust the front feet
located at the bottom of the unit.
3. Install the cooler away from direct sunlight and heat sources such as
stoves, heaters, or radiators. Direct sunlight may affect the unit's acrylic
coating, and nearby heat sources can increase electrical consumption.
Extreme cold or hot ambient temperatures may also prevent proper
performance.
4. Once the cooler is plugged in, let the beverage cooler run for at least 30
minutes. Do not change the temperature or adjust any settings at this
time.
www.newair.com
EN
9