Descargar Imprimir esta página

Gallagher S100 Instrucciones página 10

Portable solar fence energizer
Ocultar thumbs Ver también para S100:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42
IMPORTANT BATTERY INFORMATION
Recharging the ba ery
Storing the energizer
Maintenance free
ba ery
Ba ery replacement
Removing the ba ery
Disposing the energizer
Disposing the ba ery
PRODUCT SPECIFICATIONS
Ba ery
Current draw
Stored energy
Output energy
Output voltage (no load)
10
3E4208 Gallagher S100 Solar Energizer User Manual
Switch the energizer off . Place in sunlight for
3 days with the ba ery connected OR remove
the ba ery from the energizer and charge the
ba ery for 24 hours with a 12 V 1.2A ba ery
charger in a ven lated area.
Switch the energizer off . Store in a well lit
area so solar panel keeps ba ery charged.
Recharge ba ery before and a er storage.
The ba ery must not be opened and does not
require maintenance.
Use only 12 V 7 Ah sealed, valve regulated
(VRLA) rechargeable ba eries.
Switch the energizer off before removing the
ba ery.
The ba ery must be removed from the
energizer before the energizer is disposed.
Lead acid ba eries must be disposed of safely
according to local regula ons.
12 V 7 Ah sealed lead acid (2M1873)
43 mA
1.0 J
0.74 J
9.0 kV

Publicidad

loading