NuTone ULTRA Pro RN80 Guía Para La Instalación página 10

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Page 10
Retrofit Installation
11
Install Knockout Plate, Connect Wires and Install Wiring Panel
• Use proper UL-approved connectors to secure wiring to the Knockout Plate provided in Parts Bag.
• Connect wires as shown in wiring diagram.
Attach cable clamp to Knockout
1
Plate. Knockout Plate mounts to
inside of Housing and may be
2
Screw from
Parts Bag
oriented as
desired.
Screw set
aside in
Step 6
Connect
3
wires
5
ON/OFF
ON/OFF
SWITCH
SWITCH
BLK
BLK
LINE
WHT
LINE
WHT
IN
IN
GRD
GRD
SWITCH BOX
SWITCH BOX
BLACK
BLACK
WHITE
GROUND (green or bare)
WHITE
GROUND (green or bare)
ON/OFF
ON/OFF
SWITCH
SWITCH
(purchase separately)
(purchase separately)
120 VAC LINE IN
120 VAC LINE IN
RN80
4
BLK
BLK
BLK
BLK
WHT
WHT
GRD
GRD
SWITCH BOX
SWITCH BOX
KNOCKOUT
KNOCKOUT
RN110 Installation Guide
n
WHT
WHT
FAN
FAN
UNIT
UNIT
RECEPTACLE
RECEPTACLE
PLATE
PLATE

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ultra pro rn110

Tabla de contenido