Descargar Imprimir esta página

KAPSCH B’MOOV - 5310 Guía De Usuario página 37

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 55
Do not interact with the unit while passing through an automated toll lane.
When approaching a toll gate, to ensure your vehicle is recorded:
i
- Slow down and respect the minimum distance of 4 m between vehicles
- Follow the signs
- Wait until the light is green and the barrier is raised before starting
- Do not interact with the unit while passing through an automated toll lane.
When driving on toll networks, the unit must always be in position on its support.
CHAPTER 8
Network LED
OPERATIONNAL UNIT
Unit
Unit
x1 or x2
Unit
OPERATING THE UNIT
The technical and network LED are green.
Your unit is operational.
Meaning of the beeps
On the French, Spanish, Portuguese, Austrian, Italian,
Liefkenshoek (Belgium) and Herrentunnel (Germany)
networks, one or two beeps can be heard when your
vehicle is detected while passing through a gantry.
LED meaning
The
LED is white.
You have received a message.
37
Technical LED
Message LED
LED meaning
What to do
Check your messages
the next time you
stop.
Press .

Publicidad

loading